École du Dôme

Complete development of the schoolyard

École du Dôme, located in the Hull sector, is a dynamic primary school where the outdoor environment plays a key role in the daily lives of children. DLS Construction carried out the final development of the exterior schoolyard, including asphalt paving, the construction of a concrete staircase, the installation of psychomotor play structures, concrete curbs, architectural block retaining walls, and the addition of vegetation (trees and grass). The yard was designed as a stimulating and versatile space for young people. The work was completed under a tight time constraint, with the construction window limited between July and October. Another significant technical challenge was the installation of a complex underground water drainage system, adapting to different ground levels.

Client :  Centre de services scolaire des Portages-de-l'Outaouais